1. 石匠们用连接法将楣石水平放置,将石块连接起来,然后将这些直立的石块和楣石用球窝接头或楔口接头来固定。
They made joints in stone keeping the lintels in place horizontally using a tongue and groove joint and subsequently fixing the upright and lintel with a ball and socket joint or mortice and tenon.

youdao

2. 简述了板石矿业公司上青矿640主运输平巷在硐段施工过程中,克服地质条件复杂、多变的现状,采用撞超前支架法施工,硐掘凿获得成功。
The geological condition is complicated and varies often. Using the method of pre-support through hammering wedge, the cave mouth digging work of No. 640 main transportation channel was successful.

youdao

3. 简述了板石矿业公司上青矿640主运输平巷在硐段施工过程中,克服地质条件复杂、多变的现状,采用撞超前支架法施工,硐掘凿获得成功。
The geological condition is complicated and varies often. Using the method of pre-support through hammering wedge, the cave mouth digging work of No. 640 main transportation channel was successful.

youdao