1. 试压前要封好盲板,认真检查管路是否连接正确,有无管内死现象。
Seal the blind plate and check carefully whether the pipeline is correctly connected and block phenomenon in the pipe before pressure test.

youdao

2. 在对浅层套管封失效原因深入分析的基础上,在“建网,再封”的思路指导下研制了新型剂。
Base on the analysis about the reason of failure plugging, a new type chemical plugging agent was manufactured by the way of "plugging before net-setting".

youdao

3. 在对浅层套管封失效原因深入分析的基础上,在“建网,再封”的思路指导下研制了新型剂。
Base on the analysis about the reason of failure plugging, a new type chemical plugging agent was manufactured by the way of "plugging before net-setting".

youdao