1. This paper explores the tide-induced groundwater head fluctuation in a coastal multi-layered aquifer system with a suboutcrop covered by a siltlayer.
本文考察了海底露头处具有淤泥层的滨海含水层系统中由海潮引起的水头波动。
来自互联网
2. The ground stratum is quite complex, with siltlayer and fine sand layer mixed, so the construction is difficult to be carried out and the requirement of pit support is strict.
基坑所处地层十分复杂,有较厚的淤泥层和细砂层,基坑支护要求高,施工难度大。
来自互联网
3. Afterwards during the season of subsidence, the water would subside, or recede, revealing a new layer of fertile black silt and allowing for the planting of various crops.
在随后的沉降季节,水会退去,并露出一层新的肥沃的黑色淤泥,可以在这上面种植各种作物。
来自互联网
4. Particularly, the solution for impermeable silt-layer can be used to describe the tidal fluctuation in a confined aquifer under a tidal river separated by an impermeable layer.
特别地,当边界淤泥层为隔水层时,本文的解也可用来描述有潮河流下的承压含水层中的水头波动情况。
来自互联网
5. Hypothetical example shows that neglecting the silt-layer may results in significant parameter errors and parameter estimation discrepancy between the amplitude attenuation and the time lag methods.
6. The amplitude of the head fluctuation decreases with the storativity and leakage of both semi-permeable layers and increases with the leakance of the silt-layer.
7. By analyzing the settlement observed data in construction and running period of Jie-Pu Expressway, it shows that sand wick is reasonable and necessary for treating rotten wood and silt mixed layer.
8. The method for making judgment to the optimal tamp number of foundation, which have silt and sand layer as well as have clay, were analyzed.
对既有砂性土又有粘性土地基的点夯最佳夯击击数的确定方法进行了分析;
来自互联网
9. The practice has proofed it is a kind of effective and economic way to reinforce the groundsill of combined backfill stone layer with silt and clay.
实践表明:强夯置换法对含石填土层,淤泥质粘土层是一种经济有效的地基加固方法。
来自互联网
10. The practice has proofed it is a kind of effective and economic way to reinforce the groundsill of combined backfill stone layer with silt and clay.