24. One thing your enterprise must do is assess the data owned by a legacysystem and the system's capability to notify interested parties of changes.
您的企业必须进行的一项工作是,要评估遗留系统所拥有的数据以及系统通知更改的相关方的能力。
来自互联网
25. During the transition phase, the models and documentation of the legacysystem are transferred to the team that will forward-engineer the new system.
在转换阶段,将遗留系统的模型合文档传递到将正向工程新系统的团队。
来自互联网
26. A structural element can be a subsystem, a process, a library, a database, a computational node, a legacysystem, an off-the-shelf product, and so on.
一个结构组件可能是一个子系统,进程,库,数据库,计算结点,馈赠系统,按需产品等等。
来自互联网
27. For instance, the actual client application might be part of an existing large, monolithic legacysystem that cannot be readily separated and archived.
例如,实际客户机应用程序可能是现有大型单片遗留系统的一部分,从而不能轻易分离和归档。
来自互联网
28. Using the same program for two different platforms — because of heterogeneous systems or the need to transition from a legacysystem to a newer system.
两个不同的平台使用相同的程序——这是由于异构系统或将遗留系统转换成新系统的需要。
来自互联网
29. Payroll data service component: interacts with the legacysystem and provides basic, HRA, variable pay, perks, and Income tax information to the payroll service.
30. It consists of three phases: management of the legacysystem; transition to the new platform or system; and stabilization and management of the new platform.