1. Firstly, the construction of ELV system is was analyzed and content of workflow modeling is was introduced.
首先对弱电信息系统的组成进行了分析,并介绍了工作流的建模内容;
来自互联网
2. I have certain electrical building professional knowledge, be familiar with building automation, building elv.
我有一定的建筑电气专业知识,熟悉楼宇自动化、建筑弱电。
来自互联网
3. Good knowledge and practical skills in AC/AV/Elec. /ELV/Plumbing/Kitchen equipment/painting/decorating/carpenter.
在强电/空调/弱电/机管/厨房设备/油漆/装饰/木工方面拥有良好的理论及实践技巧。
来自互联网
4. Finally, taking ELV engine as example, an application research about the optimized remanufacturing reverse logistics network model is carried out.
最后,以汽车发动机为例,对所建再制造逆向物流网络稳健优化模型进行了实际案例应用研究。
来自互联网
5. Besides, several key problems about how to operate green take-back system of ELV are pointed out, such as take-back network, take-back model, performance evaluation, etc.
并指出了报废汽车绿色回收系统研究需要解决的几个关键技术,如回收网络、回收模式和绩效评价等。
来自互联网
6. Responsible for the maintenance of the ELV, telephone systems, fire alarm, monitoring system. To assist the operation and maintenance work of the audio and video installation.
7. Elv maintenance groups: responsible for the elv work, including fire alarm system, broadcasting system, emergency lighting system, monitoring systems, access control, conference room av system, etc.
8. Elv maintenance groups: responsible for the elv work, including fire alarm system, broadcasting system, emergency lighting system, monitoring systems, access control, conference room av system, etc.